The total renovation typically takes around 48 hours, depending on the project and drying times of the materials used.
Important drying time considerations:
Silicone joints must fully cure before being subjected to stress
Waterproofing slurries may require up to 3 days to dry before the shower can be used
Always refer to the relevant manufacturer’s instructions for proper curing and drying times.