Product information
wedi Fundo shower elements can be laid on a wide variety of substrates, such as screed or wooden flooring.
The Fundo sealing set consists of a 2-component slurry sealants and wedi Tool sealing tape/sealing corners for flexible joint sealing.
- Waterproof and frost-resistant, for universal indoor and outdoor use
- Ageing-resistant, unaffected by environmental influences
- Crack-bridging, provides good protection against subsequent surface cracking
Technical Details
Technical properties - Sealant | |
---|---|
Powder component | Special cement mortar with selected additives |
Liquid component | Modified acrylate dispersion |
Maturing time | approx. 3 minutes |
Processing time | approx. 1 to 1.5 hours (at +20°C /50% rel. humidity) (Higher temperatures and humidity will reduce the specified times, lower temperatures will extend them.) |
Processing temperature | from +5°C to +25°C |
Rain resistance | |
at + 20°C and 50% relative humidity | Can be walked on after approx. 6 hours |
at + 20°C and 50% relative humidity | Ceramic covers can be applied after approx. 12 hours |
at + 20°C and 50% relative humidity | Can be exposed to contact with water after approx. 3 days |
Consumption | Sufficient for approx. 10 m of joint seals |
Downloads
abP building board and Fundo with Ardex X77
abP building board and Fundo with Kiesel
abP building board and Fundo with Mapei
abP building board and Fundo with PCI
abP building board and Fundo with Sakret
abP building board and Fundo with Schoenox
abP building board and Fundo with wedi 320
abP Fundo Plano
abP Fundo Plano Linea
abP shower system Linear Drain MiniMax
wedi certificate BBA Fundo shower elements
Brochure - Fundo Shower Systems
Brochure - wedi at a glance
Brochure - wedi world of systems
Certificat - GEV EMICODE for wedi 610 Joint Sealant
Technical datasheet - Fundo sealing set
Certificate ISO 50.001 - Energy management system (valid from 2022-2025)
ISO 9001:2015 certificate
Usage
For sealing wedi Fundo joints and wedi building boards in wet areas.
Pour the liquid component into the bucket provided and mix mechanically with the powder component without lumps until a homogeneous, workable consistency is achieved. Cover joints with a scratch coat using the levelling method. Insert the sealing tape into the first layer and cover completely with the second layer.
What must be observed when preparing the substrate?
This content is provided by YouTube. By loading this content, you consent to the transfer of your data to YouTube / Google. You can find more information about this here:
Google Privacy.
