Project information
For the bathroom in the Spreewald, more precisely in Lübbenau, 15 bank systems with a total processing of approx. 145 m, straight and organic, were manufactured. The uncoated benches were then further processed by the cooperation partner before they reach the hands of an artist. He converted the benches into "wooden benches" and moss seats using the airbrush process.
Swimming pool redesign
Lübbenau
Germany
Renovation
Thomas Grübling | atelier101 | Architekturgesellschaft mbB
Grübling + Kindermann
Großenhainer Straße 101
Turm A
01127 Dresden
Mushroom design
Bergstrasse 3
76316 Malsch-Sulzbach
www.pilzdesign.de
Spreewelten Bad
Alte Huttung 13
03222 Lübbenau/Spreewald
The highlight of the Spreeweltenbad should be taken into account: Swimming with the penguins had to be brought further to the fore and humans had to be brought even closer to the animal. That is why both the visitor's pool for the guests and, above all, the diving pool for the penguins were expanded in size.